MINE TYPE: |
AVERAGE PLANT THROUGHPUT: |
Open-pit | 36,000 TPD |
Operations are currently exploiting the oxide gold reserve by open pit methods using conventional drill, blast, shovel and truck open pit methods. The oxide ore is truck-dumped directly onto leach pads or to stockpiles with no crushing or agglomeration required prior to leaching. The mine currently operates at 36,000 tonnes per day.